❶ 土木工程道路桥梁外文文献 翻译后大概要求3000字左右 邮箱[email protected] 谢谢各位大虾
1、沥青路面结构设计的低成本 structural Design of Asphalt Pavement for Low Cost 农村道路 Rural Roads
2、structural Design of Asphalt Pavement for Low Cost Rural Roads In developing countriesrural road construction is mostly cumbered by shortage of funds. Engineers concerns most in rural areas is how to build roads which not only cost less but also meet the traffic demands. Especially in vast rural areas of China, there are a great variety of transportation patterns, and the traffic composition is very complex. Compared with other countriesthe traffic composition in China rural areas have its own features. Thereforethere is no experience about the rural roads construction for reference. In recent yearsthe central government of China has increased the strength for rural road construction. At the same timea lot of researches about rural road construction have been done by researchers in China, and some conclusions about china rural roads have been made. In the authors' opinionthe selection of the pavement structure material is the key measure to rece the construction cost of rural roads after the route has been determined. Compared with concrete pavementasphalt pavement relatively costs less and is the first choice for rural roads in China. And thenaccording to the research achievements about rural roads constructionthe authors have done some preliminary researches on the structure design for low-cost asphalt pavements for rural roads.
3、沥青路面结构设计的低成本农村道路 在发展中国家,农村道路建设主要是因缺乏资金而受阻。工程师最关心的农村问题是如何修建的公路不仅成本低,而且满足交通需求。特别是在广大农村地区,有各种各样的交通方式,交通成分非常复杂。与其他国家相比,在中国农村地区交通组成有其自身的特征. 因此,没有足够经验对农村公路建设提供参考依据。近年来,中国的中央政府增加了对农村公路建设的力量。与此同时, 在中国研究人员已经完成了关于中国农村道路的大量研究和一些结论。在作者的观点,选择不同的路面结构材料是关键措施从而降低农村道路的工程造价。相比,沥青混凝土路面相对费用少、是第一个在中国农村道路的选择。然后,根据农村道路建设研究成果,作者也做了一些对低成本沥青路面结构设计的初步研究。 1 农村道路交通组成 农村道路包括县公路、城市道路和村的道路。 农村道路上交通通常是喜忧参半。一个平常县的道路交通量平均为的300至1500辆/ 天一个经济发达的县,已经达到了1000到2000 辆/ 天。通信量县、镇之间是100到300辆/ 天交通量之间通常低于城镇是100至300辆/ 天。在一个混合交通流、卡车占有40%到70%的交通量,主要为轻型卡车携带小于2.5吨(包括农业车辆如拖拉机等)、行走、中型卡车2.5 - 5吨。大部分的轻或中等卡车超载。重型卡车的比例小于9%。某些道路上的比例对县、超载的卡车是5%至32%,而在一些县公路连接到国家或省级公路的比例躯干,超载的比例通常数量的20%提高到32%。 交通量对农村道路不会很重。然而,考虑到中国的实际情况,以及车辆超载,要满足 100 kN,和 BZZ-100标准轴载作用次数。 人行道挠度和底部的拉应力作为沥青路面设计参数。轴载荷计算方式,依照下面的公式: 4.351 2( / )si siNC C P PN
❷ 求一篇关于土木工程的外文翻译或者文献。
土木工程的外文翻译或者文献外文文献有,翻译没有,翻译得靠你自己了,如果需要直接网络Hi中留言同时贴出问题的链接地址和邮箱地址即可,希望能满足你的需要,能帮到你,并请及时知道评价,多多给点悬赏分吧,急用的话请多选赏点分吧,这样更多的知友才会及时帮到你,我找到也是很花时间的,并请及时采纳
❸ 土木工程类得外文文献在哪里找
推荐到OA图书馆进行下载,输入英文关键词即可。
❹ 跪求一份土木工程外文文献最好带有翻译
外刊文献,实在没有就关于土木工程的就好,注明出处。求各位大神
❺ 土木工程道路方面外文文献 翻译后大概要求2W个字母左右 邮箱[email protected] 谢谢各位
我刚刚发给你了,不晓得时间算不算晚。。O(∩_∩)O~
❻ 土木工程外文文献
刚好我也在做毕业设计 把我的给你用吧!
Traditional Construction Proceres
As mentioned before, construction under the traditional construction procere is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schele. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and services.
A general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general contractor.
Sometimes, in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheled and coordinated by the general contractor, but they are paid directly by the owner.
Sometimes also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the homes.
Administration of the construction procere often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schele. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and construction.
Construction contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their trade.
During construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent intervals.
In addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building code.
Following is a description of the basic traditional construction procere for a multistory building.
After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway departments.
The general contractor plans and scheles construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to proceed.
Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.
Field offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted away.
Next, the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is drained.
Major construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of personnel.
As the building rises, pipes, cts, and electric conit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,
Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and cleaned.
The owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.
传统的施工程序
众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。
一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。
有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。
还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。
施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。
建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。
在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。
此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。
以下是传统多层建筑施工的基本程序。
建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。
总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。
在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。
承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。
下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。
建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。
由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。
精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。
业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。
请采纳。
❼ 求土木工程相关英文文献
试试OA图书馆吧。
可以查免费英文文献,翻译一般得自己做。
❽ 土木工程的外文 文献数据库
万方数据库,知网,你是大学生吧,学校的图书管理一般都有外文期刊杂志之类的。那两个地方只能用校园网上,(其他地方收费)。by 土木男