1. 建筑翻译,土木工程的外文翻译
这种翻译是要收钱的~~~
我说实话~~~这东西没几个小时搞不定~~~肯定要查东西的~~~
2. 有关土木工程的外文学术期刊有哪些啊
土木工程的话肯定是EI、SCI了,下面是一些简介,希望对你有帮助,求加分...............
SCI:是一部国际性的检索刊物,包括有:自然科学、生物、医学、农业、技术和行为科学等,主要侧重基础科学。所选用的刊物来源于94个类、40多个国家、50多种文字,这些国家主要有美国、英国、荷兰、德国、俄罗斯、法国、日本、加拿大等,也收录一定数量的中国刊物。
EI:《工程索引》(The Engineering Index,简称EI)创刊于1884年,是美国工程信息公司(Engineering information Inc.)出版的著名工程技术类综合性检索工具。EI每月出版1期,文摘1.3万至1.4万条;每期附有主题索引与作者索引;每年还另外出版年卷本和年度索引,年度索引还增加了作者单位索引。收录文献几乎涉及工程技术各个领域。例如:动力、电工、电子、自动控制、矿冶、金属工艺、机械制造、土建、水利等。它具有综合性强、资料来源广、地理覆盖面广、报道量大、报道质量高、权威性强等特点。
3. 求土木工程毕业外文翻译一篇
building types and design
A building is closely bound up with people,for it provides with the necessary space to work and live in .
As classified by their use ,buildings are mainly of two types :instrial buildings and civil buildings .instrial buildings are used by various factories or instrial proction while civil buildings are those that are used by people for dwelling ,employment ,ecation and other social activities .
Instrial buildings are factory buildings that are available for processing and manufacturing of various kinds ,in such fields as the mining instry ,the metallurgical instry ,machine building ,the chemical instry and the textile instry . factory buildings can be classified into two types single-story ones and multi-story ones .the construction of instrial buildings is the same as that of civil buildings .however ,instrial and civil buildings differ in the materials used and in the way they are used .
Civil buildings are divided into two broad categories: residential buildings and public buildings .residential buildings should suit family life .each flat should consist of at least three necessary rooms : a living room ,a kitchen and a toilet .public buildings can be used in politics ,cultural activities ,administration work and other services ,such as schools, office buildings, parks ,hospitals ,shops ,stations ,theatres ,gymnasiums ,hotels ,exhibition halls ,bath pools ,and so on .all of them have different functions ,which in turn require different design types as well.
Housing is the living quarters for human beings .the basic function of housing is to provide shelter from the elements ,but people today require much more that of their housing .a family moving into a new neighborhood will to know if the available housing meets its standards of safety ,health ,and comfort .a family will also ask how near the housing is to grain shops ,food markets ,schools ,stores ,the library ,a movie theater ,and the community center .
In the mid-1960’s a most important value in housing was sufficient space both inside and out .a majority of families preferred single-family homes on about half an acre of land ,which would provide space for spare-time activities .in highly instrialized countries ,many families preferred to live as far out as possible from the center of a metropolitan area ,even if the wage earners had to travel some distance to their work .quite a large number of families preferred country housing to suburban housing because their chief aim was to get far away from noise ,crowding ,and confusion .the accessibility of public transportation had ceased to be a decisive factor in housing because most workers drove their cars to work .people we’re chiefly interested in the arrangement and size of rooms and the number of bedrooms .
Before any of the building can begin ,plans have to be drawn to show what the building will be like ,the exact place in which it is to go and how everything is to be done.
An important point in building design is the layout of rooms ,which should provide the greatest possible convenience in relation to the purposes for which they are intended .in a dwelling house ,the layout may be considered under three categories : “day”, “night” ,and “services” .attention must be paid to the provision of easy communication between these areas .the “day “rooms generally include a dining-room ,sitting-room and kitchen ,but other rooms ,such as a study ,may be added ,and there may be a hall .the living-room ,which is generally the largest ,often serves as a dining-room ,too ,or the kitchen may have a dining alcove .the “night “rooms consist of the bedrooms .the “services “comprise the kitchen ,bathrooms ,larder ,and water-closets .the kitchen and larder connect the services with the day rooms .
It is also essential to consider the question of outlook from the various rooms ,and those most in use should preferably face south as possible .it is ,however ,often very difficult to meet the optimum requirements ,both on account of the surroundings and the location of the roads .in resolving these complex problems ,it is also necessary to follow the local town-planning regulations which are concerned with public amenities ,density of population ,height of buildings ,proportion of green space to dwellings ,building lines ,the general appearance of new properties in relation to the neighbourhood ,and so on .
There is little standardization in instrial buildings although such buildings still need to comply with local town-planning regulations .the modern trend is towards light ,airy factory buildings .generally of reinforced concrete or metal construction ,a factory can be given a “shed ”type ridge roof ,incorporating windows facing north so as to give evenly distributed natural lighting without sun-glare .
翻译:
建筑类型和设计
建筑物与人们有着紧密的联系,他为人们提供必要的空间,用以工作和生活。
根据适用类型不同,建筑物可以分为两类:工业建筑和民用建筑。工业建筑包括各个工厂或工业生产所使用建筑,民用建筑是指那些人们用以居住,就业,教育和其他社会活动的建筑场所。
工业建筑的厂房可用于采矿业,冶金工业,机械制造,化学工业和纺织工业等各类领域的加工和制造。厂房可分为两种类型:单层的和多层的。工业建筑也属于建筑的一种。但是,工业建筑与民用建筑所用的材料和建筑方式不同。
民用建筑按使用可分为两大类:住宅建筑和公共建筑。住宅建筑要适应家庭生活。每个单位应包括至少三个必要客房:起居室,厨房和厕所。公共建筑可在政治,文化活动,管理工作和其他服务,如学校,写字楼,公园,医院,商店,车站,剧院,体育馆,宾馆,展览馆,洗浴池,等等。他们都有着不同的职能,这反过来又需要不同的设计类型。
房屋是用以住人的. 其基本功能是提供住房的内容,但今天人们需要更多的住房内容。一个家庭在进入一个新的社区后将知道,现有住房不仅要符合其安全,健康和舒适等标准。还要考虑其附近是否有相应的配套设施,如食品市场,学校,商店,图书馆,电影院,以及社区中心等。
在60年代中期住房最重要的价值是足够大的空间和方便的出入交通。大多数家庭会首选约半英亩面积土地的家庭住宅,这样将提供足够的空间的用以业余活动。在高度工业化的国家,许多家庭的首选是那种尽可能远离市中心商业圈的住房,即使距离上班地点不得不有一段距离。相当多的家庭首选是郊区的住房,因为他们的主要目的是要远离噪音,拥挤和混乱。拥有方便的公共交通使得距离不再是一个决定性因素,因为大多数人都是开着自己的汽车去上班了。人们现在主要感兴趣的是户型,房间的大小和卧室的数目。
在工程项目开始之前,要做好建筑设计和施工流程,让人提前知道该建筑建成后是什么样子以及下一步应该做什么。
在建筑设计中要特别重视房间的布局,其目的是提供最大的便利与可能的用途。在一个住宅建筑设计中,布局可考虑以下三个方面: “白天” , “夜晚”和“服务”。必须注意这些空间区域之间的连通交流。 “白天”房一般包括餐厅,起居室和厨房,但其他房间可能会增加,如书房,并有可能成为一个大厅。起居室通常是最大的,往往是一个餐厅,也或可能有厨房、凹室等。 “夜间”房间包括卧室、客房。“服务”用房间包括厨房,浴室,储藏室 ,和厕所等。厨房和储藏室需设置在一起,以方便其房间功能的使用。
此外,还必须考虑各种客房的朝向问题,当然最好尽可能的将那些经常使用的房间朝南设置。然而,在考虑到周围的环境和地点、道路等多方面因素,往往很难达到最佳要求。在解决这些复杂的问题,还必须按照当地城市规划条例所涉及的对公共设施,人口密度,建筑物高度,绿化面积,建筑红线等的要求,还要考虑到有相邻建筑的情况,等等。
尽管工业建筑需要符合当地城市规划条例但很少有标准化的工业楼宇。现代厂房建筑的趋势是轻质、通风。一般的钢筋混凝土结构或钢结构的工厂,可以得到一个“跌”型脊屋顶,把窗户开向北以便使分布均匀的自然采光不会直射进来造成刺眼。
4. 求一篇关于土木工程的外文翻译或者文献。
土木工程的外文翻译或者文献外文文献有,翻译没有,翻译得靠你自己了,如果需要直接网络Hi中留言同时贴出问题的链接地址和邮箱地址即可,希望能满足你的需要,能帮到你,并请及时知道评价,多多给点悬赏分吧,急用的话请多选赏点分吧,这样更多的知友才会及时帮到你,我找到也是很花时间的,并请及时采纳
5. 土木工程外文文献
刚好我也在做毕业设计 把我的给你用吧!
Traditional Construction Proceres
As mentioned before, construction under the traditional construction procere is performed by contractors. While they would like to satisfy the owner and the building designers, contractors have the main objective of making a profit. Hence, their initial task is to prepare a bid price based on an accurate estimate of construction costs. This requires development of a concept for performance of the work and a construction time schele. After a contract has been awarded, contractors must furnish and pay for all materials, equipment, power, labor, and supervision required for construction. The owner compensates the contractors for construction costs and services.
A general contractor assumes overall responsibility for construction of a building. The contractor engages subcontractors who take responsibility for the work of the various trades required for construction. For example, a plumbing contractor installs the plumbing, an electrical contractor installs the electrical system, and an elevator contractor installs elevators. Their contracts are with the general contractor, and they are paid by the general contractor.
Sometimes, in addition to a general contractor, the owner contracts separately with specialty contractors, such as electrical and mechanical contractors, who perform a substantial amount of the work require for a building. Such contractors are called prime contractors. Their work is scheled and coordinated by the general contractor, but they are paid directly by the owner.
Sometimes also, the owner may use the design-build method and award a contract to an organization for both the design and construction of a building. Such organizations are called design-build contractors. One variation of this type of contract is employed by developers of groups of one-family homes or low-rise apartment buildings. The homebuilder designs and constructs the dwellings, but the design is substantially completed before owners purchase the homes.
Administration of the construction procere often is difficult. Consequently, some owners seek assistance from an expert, called a professional construction manager, with extensive construction experience, who receives a fee. The construction manager negotiates with general contractors and helps select one to construct the building. Managers usually also supervise selection of subcontractors. During construction, they help control costs, expedite equipment and material deliveries, and keep the work on schele. In some cases, instead, the owner may prefer o engage a construction program manager, to assist in administrating both design and construction.
Construction contractors employ labor that may or may not be unionized. Unionized craftspeople are members of unions that are organized by construction trades, such as carpenter, plumber, and electrician unions, Union members will perform only the work assigned to their trade.
During construction, all work should be inspected. For this purpose, the owner, often through the architect and consultants, engages inspectors. The field inspectors may be placed under the control of an owner’s representative, who may be titled clerk of the works, architect’s superintendent, engineer’s superintendent, or resident engineer. The inspectors have the responsibility of ensuring that construction meets the requirements of the contract documents and is performed under safe conditions. Such inspections may be made at frequent intervals.
In addition, inspections also are made by representatives of one or more governmental agencies. They have the responsibility of ensuring that construction meets legal requirements and have little or no concern with detailed conformance with the contract documents. Such legal inspections are made periodically or at the end of certain stages of construction. One agency that will make frequent inspections is the local or state building department, whichever has jurisdiction. The purpose of these inspections is to ensure conformance with the local or state building code.
Following is a description of the basic traditional construction procere for a multistory building.
After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction permits, as required, form governmental agencies, such as the local building, water, sewer, and highway departments.
The general contractor plans and scheles construction operations in detail and mobilizes equipment and personnel for the project. Subcontractors are notified of the contract award and issued letters of intent or awarded subcontracts, then are given, at appropriate times, notices to proceed.
Before construction starts, the general contractor orders a survey to be made of adjacent structures and terrain, both for the record and to become knowledgeable of local conditions. A survey is then made to lay out construction.
Field offices for the contractor are erected on or near the site. If desirable for safety reasons to protect passersby, the required to be removed from the site are demolished and the debris is carted away.
Next, the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is drained.
Major construction starts with the placement of foundations, on which the building rests. This is followed by the erection of load-bearing walls and structural framing. Depending on the height of the building, ladders, stairs, or elevators may be installed to enable construction personnel to travel from floor to floor eventually to the roof. Also, hoists may be installed to lift materials to upper levels. If needed, temporary flooring may be placed for use of personnel.
As the building rises, pipes, cts, and electric conit and wiring are installed. Then, permanent floors, exterior walls, and windows are constructed. At the appropriate time, permanent elevators are installed. If required, fireproofing is placed for steel framing. Next, fixed partitions are built and the roof and its covering are put is place,
Finishing operations follow. There include installation of the following: ceilings; tile; wallboard; wall paneling; plumbing fixtures; heating furnaces; air-conditioning equipment; heating and cooling devices for rooms; escalators; floor coverings; window glass; movable partitions; doors; finishing hardware; electrical equipment and apparatus, including lighting fixtures, switches, transformers, and controls; and other items called for in the drawings and specifications. Field offices, fences, bridges, and other temporary construction must be removed from the site. Utilities, such as gas, electricity, and water, are hooked up to the building. The sit is landscaped and paved. Finally, the building interior is painted and cleaned.
The owner’s representatives then give the building a final inspection. If they find that the structure conforms with the contract documents, the owner accepts the project and gives the general contractor final payment on issuance by the building department of a certificate of occupancy, which indicates that the completed building meets building-code requirements.
传统的施工程序
众所周知,在传统的施工程序中进行施工的承包商。尽管他们想满足业主和建筑设计师的要求,但是最终还是以赚取利润为主要目标的。因此,他们最初的任务是对编写投标价格的建筑成本进行准确的估计。这就需要进行前期调查的工作并且做出施工时间表。等合约批出后,施工方必须提供所有材料并支付其费用,设备,电力,劳动力。业主此时需要进行必要的监督。
一个总承包商承担一个建筑整体的责任。从事分包的承建商则需承担建造工程所需的各个工作。例如,管道承包商安装水管,电业承办商安装电气系统,电梯则由电梯承包商安装。他们与总承包商签订合同,费用由总承包商支付。
有时候,除了一个总承包商,还有各种专业承包商,如电气和机械承包商,执行工作时需要与业主签订合同。这种承包商被称为间接承包商。他们的工作,由总承包商协调,但它们都是由业主直接联系。
还有些时候,业主可以使用设计建造方法同时兼有设计和建筑施工单位的职能。这些单位被称为设计建造承包商。这方面的一个类型的合同聘用的变化是由一户住宅或低层住宅建筑群的开发。在房屋建筑设计和建造的住房,但设计之前需要由购买房屋的业主完成。
施工过程管理往往是困难的。因此,一些业主会去寻求专家的协助,这些专家被称为专业施工经理,他们具有丰富的施工经验。施工经理与总承包商进行谈判,并选择其中一个项目。施工经理通常还监督分包商。在施工期间,它们有助于控制成本,加快运送设备和材料,并保持工作的进度。在依法行政,协助设计和建设的情况下,业主可以选择从事建筑项目经理。
建筑承包商雇用的劳动力,一般有大工和小工。大工再建筑工程中从事技术活,如木工,管道工,工会成员和电工工会,小工则执行了分配给他们的工作。
在施工期间,一切工作都要验收。因此,业主通过建筑师和监理经常进行督查。可能是名为工程员,建筑师或驻地工程师。作为业主的代表实地视察。核查人员必须确保工程符合合同文件的要求,并在安全的条件下进行的责任。这种检查可作出重复。
此外,验收还是需要一个或多个政府机构的代表。他们必须确保工程符合法律要求,并负责检查与合同文件是否一致。这种视察一般定期或在某些阶段施工结束以后进行。地方或国家建设部门具有管辖权。这些检查的目的是确保符合当地或国家的建筑规范。
以下是传统多层建筑施工的基本程序。
建造开始后合同授予开发商,业主可要求开发商开始施工之前签约给或之后签约发出书面通知的同时另一部分工作继续进行。紧接着施工方根据需要获取建筑许可证,例如当地的建设,供水,污水处理,政府机构和公路部门。
总承包商的计划和进度详细施工作业以及动员项目设备和人员。分包商得到通知后,做出签订合同的意向或授予分包合同书,然后给出在适当的时候进行通知。
在施工前启动,总承包商要进行的一项调查就是邻近结构和地形,这些都要记录在案,并要熟悉当地情况。这项调查结束以后,随即进行布局建设。
承建商的现场办事处都建在施工现场或附近。为了安全起见,必须从脚手架上移除的东西,产生的碎片都要运走。
下一步,该网架是为建设工程准备的。这项工作为地下室开挖和基础开挖的深度,以及公用事业管道转移找到正确的标高。深挖掘,土方支撑,底部排出。
建筑开始于基础上,然后是承重墙和结构框架的施工。梯子,楼梯,或电梯的安装,可让施工人员往返于各个楼层。此外,可安装卷扬机来运送材料。
由于建筑高度的上升,管道,电力管道和线路安装以及永久地板,外墙,窗户和构造的影响。在适当的时候,永久的电梯安装。再需要的情况下可以安装防火卷帘。其次,屋顶等地方也需要安装。
精加工工序安装有包括以下内容:天花板,瓷砖,墙板,墙壁镶板,水管装置,加热炉,空气调节设备,加热和冷却室装置;自动扶梯;地板,窗户玻璃;活动板,门;电气设备和仪器,包括照明灯具,开关,变压器,控制器,遵照项目的图纸和规格。外地办事处,围栏,桥梁和其他临时建筑,公共设备,如天然气,电力管道,水管,都连接到建筑上。最后,是建筑物内部的打扫和清洗。
业主的代表,会给建设工程作最后检查。如果他们满意并认为符合合同文件,那么业主接受该项目,并交给总承包商的一个占用证书,这表明,总承包商已完成建设,建设部门再根据建筑规范的要求发放最后付款。
请采纳。
6. 急求 土木工程外文翻译
这是当年毕业时我的翻译,因为原文有图表等原文也超过10000字,没法在这里发,如需要原文(pdf版及word版)及全部翻译(5000字,中文),请留下邮箱。
摘要部分的翻译:
各种断面形状钢管混凝土的单轴应力应变关系
K.A.S. Susantha , Hanbin Ge, Tsutomu Usami*
土木工程学院,名古屋大学, Chikusa-ku ,名古屋 464-8603, 日本
收讫于2000年5月31日 ; 正式校定于2000年12月19日; 被认可于2001年2月14日
¬¬
摘要
一种预测受三轴压应力混凝土的完全应力-应变曲线的方法被提出,这种三轴压应力是由环形、箱形和八角形的钢管混凝土中的限制作用导致的轴向荷载加测向压力所产生的。有效的经验公式被用来确定施加于环形钢管混凝土柱内混凝土的侧向压力。FEM(有限元)分析法和混凝土-钢箍交互作用模型已被用来估计施加于箱形和八角形柱的混凝土侧向压力。接着,进行了广泛的参数研究,旨在提出一个经验公式,确定不同的筒材料和结构特性下的最大平均侧向压力。如此计算出的侧向压力通过一个著名经验公式确定出侧向受限混凝土强度。对于高峰之后的应力-应变关系的确定,使用了有效的试验结果。基于这些测试结果,和近似表达式来推算下降段的斜度和各种断面形状的筒内侧向受限混凝土在确认的混凝土强度下的应变。推算出的混凝土强度和后峰值性能在允许的界限内与测试结果吻合得非常好。所提出的模型可用于包括梁柱构件在内的纤维分析,以确定抗震结构设计中混凝土填充钢柱筒的极限状态的推算标准。 •版权所有2001 Elsevier科学技术有限公司。
关键词: 钢管混凝土;限制;混凝土强度;延性;应力应变关系;纤维分析
Uniaxial stress–strain relationship of concrete confined by various shaped steel tubes
K.A.S. Susantha, Hanbin Ge, Tsutomu Usami *
Department of Civil Engineering, Nagoya University, Chikusa-ku, Nagoya 464-8603, Japan
Received 31 May 2000; received in revised form 19 December 2000; accepted 14 February 2001
Abstract
A method is presented to predict the complete stress–strain curve of concrete subjected to triaxial compressive stresses caused by axial load plus lateral pressure e to the confinement action in circular, box and octagonal shaped concrete-filled steel tubes. Available empirical formulas are adopted to determine the lateral pressure exerted on concrete in circular concrete-filled steel columns. To evaluate the lateral pressure exerted on the concrete in box and octagonal shaped columns, FEM analysis is adopted with the help of a concrete–steel interaction model. Subsequently, an extensive parametric study is concted to propose an empirical
equation for the maximum average lateral pressure, which depends on the material and geometric properties of the columns. Lateral pressure so calculated is correlated to confined concrete strength through a well known empirical formula. For determination of the post-peak stress–strain relation, available experimental results are used. Based on the test results, approximated expressions to predict the slope of the descending branch and the strain at sustained concrete strength are derived for the confined concrete in columns having each type of sectional shapes. The predicted concrete strength and post-peak behavior are found to exhibit good
agreement with the test results within the accepted limits. The proposed model is intended to be used in fiber analysis involving beam–column elements in order to establish an ultimate state prediction criterion for concrete-filled steel columns designed as earthquake resisting structures. •2001 Elsevier Science Ltd. All rights reserved.
Keywords: Concrete-filled tubes; Confinement; Concrete strength; Ductility; Stress–strain relation; Fiber analysis
1. Introction
Concrete-filled steel tubes (CFT) are becoming increasingly popular in recent decades e to their excellent earthquake resisting characteristics such as high ctility and improved strength. As a result, numerous experimental investigations have been carried out in recent years to examine the overall performance of CFT columns [1–11]. Although the behavior of CFT columns has been extensively examined, the concrete core confinement is not yet well understood. Many of the previous research works have been mainly focused on investigating the performance of CFT columns with various limitations. The main variables subjected to such limitations were the concrete strength, plate width-to- thickness (or radius-to-thickness) ratios and shapes of the sections. Steel strength, column slenderness ratio and rate of loading were also additionally considered. It is understandable that examination of the effects of all the above factors on performances of CFTs in a wider range, exclusively on experimental manner, is difficult and costly. This can be overcome by following a suitable numerical theoretical approach which is capable of handling many experimentally unmanageable situations. At present, finite element analysis (FEM) is considered as the most powerful and accurate tool to simulate the actual behavior of structures. The accurate constitutive relationships for materials are essential for reliable results when such analysis proceres are involved. For example, CFT behavior may well be investigated through a suitable FEM analysis procere, provided that appropriate steel and concrete material models are available. One of the simplest yet powerful techniques for the examination of CFTs is fiber analysis. In this procere the cross section is discretized into many small regions where a uniaxial constitutive relationship of either concrete or steel is assigned. This type of analysis can be employed to predict the load–displacement relationships of CFT columns designed as earthquake resisting structures. The accuracy involved with the fiber analysis is found to be quite satisfactory with respect to the practical design purposes.
At present, an accurate stress–strain relationship for steel, which is readily applicable in the fiber analysis, is currently available [12]. However, in the case of concrete, only a few models that are suited for such analysis can be found [3,8,9]. Among them, in Tomii and Sakino’s model [3], which is applicable to square shaped columns, the strength improvement e to confinement has been neglected. Tang et al. [8] developed a model for circular tubes by taking into account the effect of geometry and material properties on strength enhancement as well as the post-peak behavior. Watanabe et al. [9] concted model tests to determine a stress–strain relationship for confined concrete and subsequently proposed a method to analyze the ultimate behavior of concrete-filled box columns considering local buckling of component plates and initial imperfections. Among the other recent investigations, the work done by Schneider [10] investigated the effect of steel tube shape and wall thickness on the ultimate strength of the composite columns. El-Tawil and Deierlein [11] reviewed and evaluated the concrete encased composite design provisions of the American Concrete Institute Code (ACI 318) [13], the AISC-LRFD Specifications [14] and the AISC Seismic Provisions [15], based on fiber section analyses considering the inelastic behavior of steel and concrete.
In this study, an analytical approach based on the existing experimental results is attempted to determine a complete uniaxial stress–strain law for confined concrete in relatively thick-walled CFT columns. The primary objective of the proposed stress–strain model is its application in fiber analysis to investigate the inelastic behavior of CFT columns in compression or combined compression and bending. Such analyses are useful in establishing rational strength and ctility prediction proceres of seismic resisting structures. Three types of sectional shapes such as circular, box and octagonal are considered. A concrete–steel interaction model is employed to estimate the lateral pressure on concrete. Then, the maximum lateral pressure is correlated to the strength of confined concrete through an empirical formula. A method based on the results of fiber analysis using assumed concrete models is adopted to calibrate the post-peak behavior of the proposed model. Finally, the complete axial load–average axial strain curves obtained through the fiber analysis using the newly proposed material model are compared with the test results. It should be noted that a similar type of interaction model as used in this study has been adopted by Nishiyama et al. [16], which has been combined with a so called peak load condition line in order to determine the maximum lateral pressure on reinforced concrete columns.
Meanwhile, previous researches [17,18] indicate that the stress–strain relationship of concrete under compressive load histories proces an envelope curve identical to the stress–strain curve obtained under monotonic loading. Therefore, in further studies, the proposed confined uniaxial stress–strain law can be extended to a cyclic stress–strain relationship of confined concrete by including a suitable unloading/reloading stress–strain rule.
7. 土木工程外文翻译
在线翻译贝
8. 土木工程类得外文文献在哪里找
推荐到OA图书馆进行下载,输入英文关键词即可。
9. 跪求一份土木工程外文文献最好带有翻译
外刊文献,实在没有就关于土木工程的就好,注明出处。求各位大神